Dock Access
Our dock is located on the Ohio River at mile marker 166.25, on the left bank of the river with convenient truck access to Interstate 77 as well as local rail stations. We can also provide bulk hauling services.
Facilities include:
- 50 ton crane on-site
- Larger capacity cranes available
- Conveyor system
- Outdoor storage
- Truck scale on-site
For More Information
Toll free:
800.837.8918
Phone:
304.464.4441
Fax: 304.464.4013
Email:
carrinfo@lbfoster.com
Lunch Box Programs
- Precast Concrete Solutions: Bridge Design #PSC07(a) 1.0 Learning Unit [HSW&SU]
- Precast Concrete Preassembled Building #SPCPB 1.0 Learning Unit [HSW&SU]
Call 800.837.8918 for details or to schedule a program.
Fulton Road Bridge, Cleveland, Ohio
Precast post-tensioned arch segments used in the replacement of the historic Fulton Road Bridge. Project design utilizing three arch segments forming one complete arch with four arches per span, to a total of 72 pieces. Pieces weighed approximately 75 tons.

Contractor: Kokosing Construction Company/Fru-Con Construction Corporation
US Army Corps of Engineers
Multi-year project to replace a lock and dam (Marmet Locks & Dam, Kanawha River, West Virginia). Consisting of a three story precast architectural operations building, two precast concrete hydraulic buildings, and 24 precast post-tensioned guide wall beams, each weighing 500 tons.

Contractor: Kokosing Construction Company
Camden Clark Memorial Hospital, Parkersburg, WV
Precast box culvert sections used beneath a parking area as a drainage/ retention solution.

Contractor: Brown's Excavating
Shoemaker Coal Mine, Dallas, Marshall County, WV
Seventeen box culverts were post-tensioned together to create an escape. After the box culverts were set in place they were back filled. An additional 39 pieces were post-tensioned together for a conveyor tunnel.

Contractor: Lincoln Contracting & Equipment Company, Inc.